Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 4 results ...

Jafari, A (2013) A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(07), 746-60.

Liu, B, Wang, X, Chen, Y and Shen, Y (2013) Market structure of China’s construction industry based on the Panzar–Rosse model. Construction Management and Economics, 31(07), 731-45.

Lizarralde, G, Tomiyoshi, S, Bourgault, M, Malo, J and Cardosi, G (2013) Understanding differences in construction project governance between developed and developing countries. Construction Management and Economics, 31(07), 711-30.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2013.825044
  • Abstract:
    Whereas most experts recognize the substantial differences in the construction sector between developed and developing countries, very little is known about how and to what extent construction project governance actually differs between the two contexts. In order to shed light on these differences, a suitable definition of project governance must be adopted and identical variables must be assessed in developed and developing contexts. Three characteristics of temporary multi-organizations that conduct construction projects (used here as categories of analysis) help identify these differences: formal structuring, informal structuring, and the role and participation of stakeholders. Based on three case studies, a survey, and semi-directed interviews, significant differences are found in how power and authority are exercised (and leadership styles applied), in the use of informality and in the roles assumed by stakeholders. Although the analysis of such differences is often considered a diagnosis of problems to be "fixed" in projects in developing countries, we believe that these differences should be read as project governance mechanisms of adaptation to different environmental conditions, and therefore key elements that need to be fully understood by professionals working in developing countries.

Masrom, M D A, Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(07), 761-79.